Works at the sites in Donji Miholjec and Viljevo

At the site in Donji Miholjec the following works have been done:

  •  the woodworks and reinforcement for the building where the CHP will be situated,
  •  manholes and concrete surfaces between digesters,
  • works on the installation of an external pipeline.

In Viljevo the following works have been done:

  •  formworks and reinforcement on the bunker
  • works on the asphalt pavement for silage are completed, as well as the works on the underground part of the cogenerator unit.